Over ten years ago, when I first moved into the condo, I posted that I needed to remodel two bathrooms and the kitchen. Jay's bathroom was done a few months ago, the replacement of my bathroom started this week. Here are a few before pictures and progress from day one. The counter was low, I am slightly above average height for a man, and there is a section of my spine that no longer bends. So new taller cabinets are being installed (ahh!) My least favorite fixture in the original bath was the fiberglass tub-shower. It was ugly and flexed under my feet. It is being replaced with a walk in shower, built on a Kohler enameled cast iron shower base. I had debated for a decade doing a traditional shower, we are on the third floor, if the shower leaked, I'd have a couple of floors below me to leak into. When we went to look at fixtures and tile and I saw the cast iron shower pan, it was love at first sight. Unless someone drops a sledge hammer on it, it will outlast us all and NEVER leak. On the first day, the demo was completed and the shower base installed. Great progress.






Day two, the new plumbing was installed in the wall, the new backer and waterproof membrane installed.
Day Three, I am in Love.