I went to work in a local real estate office, and one of my office mates was an electrician, who had worked on the launch systems for the moon rockets. He was selling real estate, doing a little electrical work on the side, and hoping he could return to full time electrical work. There were only a handful of full time industrial electrician positions on the Space Coast.
He had done some thrilling things like connect the power to the external ignitors under the Saturn V that assure that those main engines fire when the fuel starts flowing. He got to talking one day, and said, "How many people does it take to change a light bulb on launch pad 39B?"
First someone fills out a form reporting a light out of service.
Then an electrician verifies that the light bulb is burned out, and it is not an electrical supply or switch problem.
Then the access crew is dispatched to set up a ladder.
Then the electrician returns to disassemble the light fixture, laying the parts out on a soft pad on the a flat surface.
Then a supervisor sends out janitorial, to clean
the fixture.
Then the electrician is sent out to replace the burned out bulb and reinstall the fixture.
Then the access crew goes back and removes the ladder,
Then janitorial goes back and cleans the area.
And a supervisor inspects and verifies that the work has been completed properly.
So three workmen, plus supervisors, at least 9 steps, more if there are any questions or concerns along the way, such as a crack in the glass on the fixture, and he said, "you don't want to know how many pages of paperwork!"
I’d sit in the dark!
ReplyDeleteI worked with a guy once, a college graduate, who couldn't change a light bulb, or do simple math on a contract,
DeleteIn spite of what seems added excessive labour costs with much checking, still rocket launches went terribly wrong.
ReplyDeleteOnce in a while, I knew one of the people whose job was to push the destruct button if something went terribly wrong.
DeleteI'm with Mitchell, though I might pack a flashlight with my lunch.
ReplyDeleteMy one and only first cousin counted the tools in the tool box when people went in and out of the shuttle orbiter processing facility.
DeleteNo wonder space travel is so expensive!
ReplyDeleteIt is not like driving a car.
DeleteKeep that accountability for the light bulb inventory!
ReplyDeleteAirlines are nearly as detailed, I have sat and waited for the technician to complete the paperwork on taping a loose trim piece in place (recently.)
DeleteFunny, but not funny, tale!
ReplyDeleteThey take this stuff kinda seriously. The tool count was implemented after the Apollo pad fire. A wrench was found under one of the seats.
DeleteThat's a lot of people! After the layoff, it probably was done by one person.
ReplyDeleteAt one time the towers were labeled abandoned in place, and later they were modified for the shuttle program.
DeleteA layoff of 10,000 employees is irresponsible. It could (and sounds like it did) devistate the local community. To be a good community steward, NASA should find ways to spread out the layoffs over a reasonable period of time, and transition employees to other projects whenever possible.
ReplyDeleteI have wondered if it was political punishment for congresspeople who didn't vote to continue the program.
DeleteBureaucracy.
ReplyDelete